[A-605] Journal · Field notes
[A-605] Journal
1 min read
Set in a day on Orcas Island
Two sections, one crane and a ferry timetable: a morning on site, hour by hour.

The trucks took the first ferry. By nine the crane was rigged, by eleven both sections were on their piers, and by four the roof joint was sealed and the wrap was off. The last ferry left with the empty trailers.
How we draw a permit set