Process · 1 min · 30.09.2026
Twelve weeks on the line
How a Norrhus goes from a cut list to a sealed section, one station at a time.
Read the post[A-600] Journal
[A-600] Journal
Notes from the drawing office
6 posts
Guides, process and design notes from the people who draw and build the houses.
Process · 1 min · 30.09.2026
How a Norrhus goes from a cut list to a sealed section, one station at a time.
Read the post
Why every Norrhus is all-electricA heat pump, a ventilation unit and a small stove: what heats a house this well insulated.
Cladding that ages wellLarch, Falu red spruce, char and aluminium, and what each looks like after ten winters.
What site work really costsFoundations, power, water and access, line by line, with the ranges we see on real lots.
Set in a day on Orcas IslandTwo sections, one crane and a ferry timetable: a morning on site, hour by hour.
How we draw a permit setWhat the county asks for, and why we draw it for every house rather than leave it to you.